Project Documents

Project Documents

NORTH SPLIT DOCUMENTS:

Project Fact Sheet – May 2018
Myths vs. Facts – May 2018
I-65/70 North Split Presentation – February 2018
Frequently Asked Questions – February 2018
Introduction to the System-Level Analysis – April 2018

Handouts, presentations and summaries for advisory committee meetings are available under the Public Outreach tab.

SYSTEM-LEVEL ANALYSIS

PREVIOUS DOCUMENTS AND STUDIES:

Purdue University Evaluation of the Hyperfix Project – September 2004

In May 2003, INDOT shut down the combined sections of I–65/70 in the heart of the Indianapolis for 85 days of rehabilitation. The project, dubbed “Hyperfix 65/70,” rehabilitated 33 bridge decks and about 35 lane-miles pavement. The Purdue Study measured the effects of the closure on local city streets.

Project Intent Report – July 2016

The Project Intent Report is a planning level document developed with preliminary data. It was developed prior to the NEPA process and does not include a preferred alternative, final design or project limits. Information in the report should be viewed as preliminary.